Cavendish Farms

2010-2011

Loading station – Baie Verte, NB

Supply and install low pressure and high pressure natural gas piping along with installation of dryer station and high pressure compressors. This included the installation and fabrication of structural steel trestle support.

Unloading station – New Annan, PEI

Supply and installation of all high pressure and low pressure natural gas piping, plus or minus 4,000 feet, for seven (7) unloading bays, including installation of PRV station, boiler heating system and trestle structural steel for seven (7) bays.

 

naturalgastransferstation

Irving Oil

2012-2013

Lincoln, NB

Custody Transfer Station, Electrical/Driver Building and Mother Station

Supply and installation of a compressed natural gas truck loading facility.

Mechanical, electrical and structural work.

 

McCain Foods

2012-2013

Florenceville and Grand Falls (Daughter stations)

Natural gas project - Decanting Stations

Supply and installation of a compressed natural gas truck loading facility.

Mechanical, electrical and structural work.

 

CFB Gagetown

2013-2014

Utility tunnel upgrade – phase 4

This project consists of removing the old high pressure high temperature water piping and replacing with new piping inside the tunnel areas. This also includes fabrication and installation of all structural steel pipe supports; installation of over 9,000 feet of below grade heating piping, complete with testing and commissioning.

 

CFB Gagetown

2013-2014

K-20 petroleum upgrade

New petroleum facility installation to service all Base equipment and helicopter fueling. This includes installation of all above grade storage tanks, off-loading systems, fueling systems, oil water separator system and all required structural steel and miscellaneous steel.

AVNackawic

2013

Decanter station
Natural gas project

Supply and installation of a compressed natural gas truck loading facility.

Mechanical, electrical and structural work. This includes all above and below grade piping, up to new burner valve train.

 

Woodstock K-8 School

2013-2014

Structural steel

Fabrication, supply and installation of all structural steel, including open web joist and decking for a new 60,000 square foot school.

 

New Oncology Clinic – Phase II

2013-2014

Ventilation work

Fabrication, supply and installation of a complete ventilation system to service the new Oncology Clinic in Moncton.

 

Glencore Canada Corporation

2013-2014

Propane conversion
Xstrata Zinc – Belledune Smelter

Supply and installation of two (2) propane storage and delivery facilities. This consists of installation of four (4) 30,000 gallons liquid propane tanks, fabrication and installation of two (2) new vaporizer buildings, including piping and electrical; fabrication and installation of two (2) new electrical rooms; fabrication and installation of new gas trains; installation of all vaporize propane piping. This includes all electrical requirements, including controls, insulation and heat tracing.

 

greyrock

Grey Rock Entertainment Centre

2013-2014

Structural steel

Fabrication and installation of structural steel, including open web joist and decking for a new casino.

CertainTeed

2013-2014

McAdam / Irving Oil / Daughter station
Natural gas project

Supply and installation of a compressed natural gas truck loading facility, including mechanical, structural and electrical.

 

Generation Hyundai

2014

Structural steel & Plumbing

Fabrication and installation of structural steel, open web joist and decking for Hyundai Garage. Design, supply and install one (1) complete plumbing system for the above noted new car dealership.

 

Connors Bros.

2014

Blacks Harbour / Irving Oil / Daughter Station 
Natural gas project

Supply and installation of a compressed natural gas truck loading facility, including mechanical, structural and electrical.

 

ecolemarieesther

Ecole Marie Gaetane

2013-2014

Kedgwick (Biomass boiler)

Design, supply, install and operate one (1) package wood pellet boiler system. This includes fabrication of structural steel building; installation of boiler and accessories; supply and installation of electrical and controls; supply and installation of wood pellet hopper and supply and installation of all required inter-connecting piping and wiring. This project includes operating the system for 15 years.

 

NBCC Edmundston

2010-2011

New facility

This project consisted of fabrication, supply and installation of all required structural steel for this building, which consisted of 950 tons of steel.